Axial Metallised Polypropylene Film Capacitor 0.47uF 470nF ±5 Percent 630V Rated with Long Lead for Radio Amplifier Pack of 20

★★★★★ 4.5 33 reviews

US$5.36
Price when purchased online
Free shipping Free 30-day returns

We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$5.36
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 22
Free
Pickup
Check nearby
Delivery
Not available

Free 30-day returns Details

Product details

Management number 234216710 Release Date 2026/06/27 List Price US$5.36 Model Number 234216710
Category

Item Descriptions: -20Pcs axial capacitors, for old radios audios and tube amplifiers. -470nF capacitance; 0 V to 630 V operating voltage; ±5 percent tolerance. -21x13mm body size, the lead length is about 40mm. -Metallised polypropylene film, with stable performance. -Lightweight with simple structure, easy to use. -A great choice for electronic professionals or enthusiasts. Package: 20x 470nF Axial Metallised Polypropylene Film Capacitor (Note: Other accessories are not include.) Item Specifications: Type:Film Capacitor Construction:Metallised Polypropylene Film Termination Style:Axial Minimum Operating Voltage:0 V Maximum Operating Voltage:630 V Tolerance Rating:±5 percent Capacitance Rating:470 nF

  • 20Pcs axial capacitors, for old radios audios and tube amplifiers.
  • 470nF capacitance; 0 V to 630 V operating voltage; ±5 % tolerance.
  • 21x13mm body size, the lead length is about 40mm.
  • Metallised polypropylene film, with stable performance.
  • Lightweight with simple structure, easy to use.
ASIN B092YL8B4Q
Model BU|814
Brand Name Micro Traders
Item Shape Round
Part Number BU|814
Manufacturer Micro Traders
Material Type Polypropylene
Mounting Type Through-Hole Mount
Maximum Voltage 630 Volts
Operating Voltage 630 Volts
Capacitance Tolerance 5
Item Dimensions W x H 0.83"W x 0.83"H

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.5 out of 5
★★★★★
33 ratings | 14 reviews
How item rating is calculated
View all reviews
5 stars
83% (27)
4 stars
4% (1)
3 stars
2% (1)
2 stars
1% (0)
1 star
10% (3)
Sort by

There are currently no written reviews for this product.